Proper Condensate Drain Line Installation

The inlet pipe should be on an angle where it enters the tank and should not interfere with the operation of the float valve that the pump uses.
Proper condensate drain line installation. Cleaning an air conditioning condensate drain. A water detection device ul 508 that will shut off the equipment in event of blockage of the primary condensate drain can be installed in any of several locations that in essence detect that the primary drain is backing up. By doni anto october 8 2019. The proper way to install a condensate drain line step 1.
Secondary condensate pan to be installed under the entire unit. Condensate discharge pipe installation ensuring proper condensate drain carrier air handler indoor er evap. Measure out the path that your drain lines will take from the drain pan to the drain field area. Air was coming in from the outside and creating a dam which was preventing the con.
Consulting specifying er cooling coil condensate system design. Turn off the power for the air conditioner unit where you will be installing the drain line. The two current popular methods are pouring white vinegar or chlorine bleach in the drain line to clear the zoola clogs. Go to the main line and pour half of the jug in the line.
About a half gallon. P traps have to be installed on a suction system so a p trap was added. Consult local codes for additional restrictions or precautions. Buy a jug of hair and grease declogger for about 12 bucks.
In the primary condensate drain pan in the primary condensate drain line or in the condensate overflow drain line positioned to detect and shut down the equipment before the primary drain pan would overflow. In order to help prevent the buildup and blockage of the condensate drain line there are a few various methods of cleaning an air conditioner drain line. This pipe should be installed so that gravity will do the work when the pump is draining the system. Drill any holes.
Condensate switches imc 307 2 3 states that all hvac equipment that produces condensate must have either a secondary drain line or a condensate overflow switch a secondary drain pan with a secondary drain line or condensate switch or some combination of these installations should be used to prevent overflow if the primary drain line blocks. Nuisance sweating may occur if the unit is installed in a high humidity environment with low airflow. Use some sort of flexible tubing if possible as the drain pipe for the pump. Some localities may allow as an alternative the running of a separate secondary condensate line.